Edwards Moving & Rigging is utilizing a variety of equipment, including a 150-ton capacity low profile hydraulic skidding system from Hydra-Slide, to remove small transformers and replace them with new units over a two-year period at a high security power plant in the south east of the US. The final changeout is scheduled for late 2019.

September 13, 2018